What Is a Change Order in Remodeling?

When a homeowner starts their remodeling project, they’re focused on their beautiful new finishes, layout, and general excitement of seeing their home improve … not details like change orders. Once construction begins, a remodeling project moves forward in a carefully planned sequence of trades, materials, and inspections.

When something about the plan changes after construction has started, the project team must adjust that sequence. That adjustment is called a “change order”, and every homeowner going through a remodeling project should know what one is, and how making them affects your project’s timeline and budget. 


What Is a Change Order?

A change order is any modification to the agreed scope of work after the project has begun. They are often things like:

  • Changing materials
  • Upgrading finishes
  • Adjusting the layout
  • Removing items that were originally planned

Even small changes will create ripple effects across the schedule, labor coordination, and materials.

Why Do Change Orders Increase Cost?

A design/build remodeling project requires significant coordination behind the scenes. We cost out and hire the labor, plan for and acquire materials, and schedule all your trades on a tight timeline for you so you don’t have to lift a finger or manage any of it with a separate GC.

Our goal is for that coordination to feel seamless to our clients, so they don’t think much about the complexity involved once construction begins. In many ways that is a good thing. It means the process feels smooth and manageable (Hooray! Main goal met.)

On the flip side, it can also mean that when a change is requested during construction, we sometimes have to deliver news homeowners do not love hearing, like how your small backsplash change has affected your budget by thousands or your timeline by weeks. Even small changes can affect the budget or timeline because they interrupt the sequence of work and require new coordination between trades, materials, and scheduling (all the stuff we don’t want you to worry about). 

A change order can create several types of cost adjustments.

Change Order Cost Adjustment 1: Additional labor and materials

Some changes require new materials or additional labor. In other cases, previously completed work may need to be modified or redone, which increases overall cost.

Change Order Cost Adjustment 2: Administrative and coordination time

When you make a change order on such a carefully coordinated effort, sometimes material pricing has changed, it will impact your schedule due to subcontractor availability, and everything has to be documented. These behind the scenes tasks take time and resources.

Why a Change Order Can Affect Project Timeline

Our design/build remodeling projects rely on precise sequencing between trades. For example:

  • Framing must be completed before drywall
  • Electrical must be completed then inspected before drywall
  • Drywall must be completed before cabinetry
  • Cabinetry must be installed before countertops
  • etc

If one item changes, especially when there are city inspections involved, the entire sequence shifts. 

Subcontractors usually bounce around between multiple projects throughout the day or week. If a scheduled window is missed, it can take some time to bring the trade team back to the site.

This is why even a small change order can extend the timeline.

An Example of a Change Order

If you have ever watched a concrete crew pour a slab, you have probably noticed that once the truck starts pouring, the process can’t stop. By the time concrete begins flowing, the site has already been graded, formed, reinforced, inspected, and scheduled. Everything has been coordinated in advance, and the mixed concrete is already beginning to dry as soon as it’s poured.

A remodeling project works the same way. Changing something once construction is underway is similar to asking to move a wall after the concrete is already halfway poured. It may still be technically possible, but it interrupts momentum.

Removing Something From the Plan Can Still Be a Change Order

Homeowners sometimes assume that removing something from the scope should automatically result in a credit. In some cases that happens, but not always! For example, a homeowner may decide not to install a quartz slab in a shower niche and instead continue the tile in that space.

Even though the quartz is no longer needed, the builder still must:

  • Urgently update our purchase order with the countertop fabricator to remove that part of the order (which involves multiple internal approvals through our departments) 
  • Update drawings or templates, which might affect permits
  • Coordinate with the tile contractor to return and complete the install differently
  • Adjust the project schedule

Because of this coordination, eliminating an item can still require a change order.

How to Reduce Change Orders During a Remodel

The best way to reduce change orders is careful planning before construction begins. At Precision Homecrafters, the design phase focuses on confirming layout decisions, materials, and construction details before work starts. Even with thoughtful planning, unforeseen conditions and new ideas sometimes appear during construction, and we can accommodate you. If you are considering a change:

  • Ask early so the team can evaluate the impact
  • Request a rough estimate before formal pricing begins
  • Expect possible adjustments to both cost and schedule

Across Precision Homecrafters projects from 2023 through 2025, change orders have averaged between only 3.5 and 4 percent of total contract value. That is a pretty low number, and it reflects our tried and true planning and detailed design processes that happen before construction begins. 

Even with strong preparation, changes still happen! New (and great) ideas are had and unforeseen conditions do occasionally appear. And sometimes a client just plain changes their mind!

If you are planning a remodel and want a tightly coordinated design/build team that guides the project from the earliest planning stages, Precision Homecrafters focuses on getting the details right up front. Thoughtful design, clear decisions, and careful coordination help reduce change orders and keep projects moving smoothly from start to finish.